How to sell a home with unpermitted work
This article is general information about disclosure and building-code procedure, not legal or tax advice. Permit rules, enforcement practice and remedies vary by state, county and municipality. Consult a Michigan real estate attorney and a qualified tax professional about your situation.

Yes, you can sell a home with unpermitted work. You just cannot hide it. Michigan’s seller disclosure statement asks in writing whether the property has “structural modifications, alterations, or repairs made without necessary permits or licensed contractors,” that statement has to reach the buyer before you execute a binding purchase agreement, and delivering it late gives the buyer 72 hours to terminate.
From there you have two honest paths: pull retroactive permits and accept whatever code upgrades the inspector requires, or price the home to reflect the risk you’re handing the buyer. Both are legitimate. Concealment is the only option that isn’t.
Learn what unpermitted work actually is, what Michigan law requires you to disclose, how conventional, FHA and VA financing treat unpermitted space, and how to decide between correcting the work and selling as-is. If you’re earlier in the process, start with our Selling a Home guide.
Key takeaways:
- Disclosure is a statutory form, not a courtesy: Michigan’s Seller Disclosure Act covers transfers of 1 to 4 residential dwelling units, the statutory form asks directly about work done without necessary permits, and late delivery hands the buyer a 72-hour right to terminate.
- Financing turns on the appraisal, not the permit file: Fannie Mae requires an appraiser who identifies an addition without the required permit to comment on the quality of the work and its impact on market value, and FHA appraisers exclude accessory dwelling unit space and finished basements from gross living area entirely.
- Fixing it starts at the counter, not the contractor: A Michigan enforcing agency must grant or deny a permit application within 10 business days, 15 for an unusually complicated project, and an altered building cannot be occupied until a certificate of use and occupancy is issued.
What is unpermitted work?
Unpermitted work is construction or alteration performed without the building permit the local enforcing agency required. Michigan’s construction code act is blunt about the sequence: except as the code otherwise provides, the construction or alteration of a building shall not be commenced until a building permit has been issued.
The usual suspects in Michigan housing stock are predictable. A basement finished into a family room and bedroom. A garage converted to living space. A three-season porch closed in and heated. A subpanel added for a hot tub. A water heater or furnace swapped by a handyman. Decks, egress windows and bathroom additions round out the list.
Two distinctions matter before you panic. First, “unpermitted” is not the same as “unsafe”. Plenty of unpermitted work was done competently and would pass inspection today. Second, it is also not the same as “illegal use.” A legally nonconforming addition and an addition built without a permit are different problems with different fixes. Our guide to home renovation permits and what you need covers which projects require one in the first place.
One more wrinkle that surprises sellers: in Michigan, a building altered in whole or in part is not supposed to be used or occupied until a certificate of use and occupancy has been issued for the alteration. Permits and occupancy approval are two separate records, and buyers’ agents increasingly ask for both.
What must you disclose about unpermitted work?
Everything you know, and the duty follows your knowledge, not who swung the hammer. Michigan’s Seller Disclosure Act applies to transfers of not less than 1 and not more than 4 residential dwelling units, and the statutory form includes an “Other Items” question asking whether you are aware of “structural modifications, alterations, or repairs made without necessary permits or licensed contractors.” If a prior owner finished the basement and the inspection report told you so, that is now your knowledge.1
Four features of the Michigan statute are worth understanding before you fill in a box:
- Timing is fixed: The written statement must be delivered before you execute a binding purchase agreement. Deliver it afterward and the buyer may terminate within 72 hours of in-person delivery, or 120 hours if it was sent by registered mail. That right ends once the property transfers by deed or installment contract.
- “Unknown” is a real answer: If information is genuinely unknown or unavailable to you, the statute lets you comply by advising the buyer that it is unknown. Writing “unpermitted, seller has no records” protects you far better than a confident “no.”
- You are not the inspector: A seller is not liable for an error or omission that was not within their personal knowledge, and the act is not violated by failing to disclose something discoverable only by opening inaccessible portions of the house or only by someone with trade expertise.
- There is no “as-is” exemption: The act’s exemption list covers court-ordered transfers, foreclosures, non-occupant fiduciaries, intrafamily transfers and a few others. Selling as-is is not on it, and an as-is clause does not license concealing a known defect.
Federal law adds a separate obligation on older homes. For target housing built before 1978, the seller must give the buyer the lead hazard pamphlet, disclose known lead-based paint and hazards, provide available records and allow a 10-day opportunity to inspect. Unpermitted work in a pre-1978 house often means disturbed painted surfaces, so these two duties tend to arrive together. Our explainer on what a seller’s disclosure is walks the form question by question, and Nolo’s overview of seller disclosure and liability basics is a reasonable orientation, not a substitute for a Michigan real estate attorney.
How does unpermitted work affect your buyer’s financing?
Through the appraisal, almost always, the permit file itself rarely reaches the underwriter. An appraiser walks the house, notices that the finished lower level or the bedroom over the garage doesn’t match public records, and writes what they see. What happens next depends on the loan program.
Conventional loans
Conventional financing is the most flexible of the three. Fannie Mae’s appraisal guidance directs that if the appraiser identifies an addition that does not have the required permit, the appraiser must comment on the quality and appearance of the work and its impact, if any, on the market value of the property. That is a documentation requirement, not an automatic denial. Well-built, market-typical work often clears; visibly amateur structural or electrical work often does not.
FHA loans
FHA appraisals apply minimum property requirements and treat added space conservatively. Under HUD’s handbook, an appraiser must not include the living area of an accessory dwelling unit in the gross living area of the primary dwelling, and more than one accessory dwelling unit on the property is a deficiency the appraiser must report to the lender. Finished basements are excluded from gross living area regardless of permit status and reported separately. On a 203(k) rehabilitation loan, funds are released only when the work meets all federal, state and local codes and ordinances, including any required permits and inspections.2
VA loans
VA financing is governed by property standards rather than a permit checklist. Federal regulation provides that no loan for the purchase or construction of residential property is eligible for guaranty unless the property complies with the standards of planning, construction and general acceptability prescribed by the Secretary. In practice that means an unpermitted addition with obvious safety or soundness problems draws a repair condition, while sound, conventional-looking work usually does not.3
Because Align Lending is a broker rather than a single lender, we can shop the same file to lenders with different overlays on unpermitted space, so one lender’s overlay is not the only answer you hear. Insurance deserves the same early attention: carriers price and underwrite from the square footage and systems they believe exist, and a claim on unpermitted electrical work is exactly the argument you don’t want your buyer having.
How do appraisal condition ratings and 203(k) loans treat unpermitted work?
The appraiser also gives the whole house a condition rating, and that rating can stop a conventional loan. Per Fannie Mae Selling Guide B4-1.3-06, dated June 4, 2025, a C6 rating means the improvements have deficiencies or defects severe enough to affect safety, soundness or structural integrity, and loans secured by C6 properties are not eligible for sale to Fannie Mae. Those deficiencies must be repaired to at least a C5 rating before the loan is sold, so what matters is whether the work reads as a safety or structural defect.
A buyer can also finance the correction. According to HUD’s 203(k) program page, the Limited 203(k) lets homebuyers finance up to $75,000 into the mortgage for minor remodeling and non-structural repairs, while the Standard 203(k) covers major rehabilitation, including structural additions, with a rehabilitation cost of at least $5,000 and a total property value that still falls within the FHA mortgage limit for the area. See FHA 203(k) loans, the home appraisal process and selling with a low appraisal.
Should you fix the work or sell as-is?
Fix it when the correction is bounded and the space is central to the home’s value; sell as-is when opening walls is the only path to compliance. The table below is the comparison most sellers actually need.
| Approach | Typical cost | Time added | Effect on buyer pool | Effect on price |
|---|---|---|---|---|
| Retroactive permit, work already to code | Permit and inspection fees, plus a contractor’s assessment | Weeks; the agency decides within 10 business days of a complete application | Widest, all loan types back in play | Best case; the space counts and the record is clean |
| Retroactive permit requiring corrections | Permit fees plus the corrective work, priced by the trade involved | Months if walls, framing or a full system must be opened | Wide, once the certificate of use and occupancy issues | Positive only if the corrected value exceeds the spend |
| Disclose and sell as-is | None beyond the disclosure and a pre-listing inspection | None | Narrower; weighted toward cash buyers and investors | Lower, the buyer prices in the unknown |
| Remove the work | Demolition and restoration | Weeks to months | Wide, but the home is smaller | Lowest of the compliant options; a last resort |
Three things sharpen the decision. Get a licensed contractor’s written estimate before you commit to either path. Guesses are how sellers end up halfway into an open wall. Order a pre-listing inspection so you are disclosing facts rather than suspicions; you can find a certified home inspector through the American Society of Home Inspectors. And remember that correction costs can become liens: unpaid contractors have rights under Michigan’s Construction Lien Act, and a construction lien attaches to the owner’s interest in the property.
If the property is a condominium, add one more call. Interior alterations frequently need association approval alongside the municipal permit, and the association’s records become part of the buyer’s due diligence.
Does legalized space pay back what it costs?
Legalizing unpermitted space usually means bringing a finished basement, attic room or added bathroom up to code, and NAR’s estimates for such projects all fall short of their cost. In its 2025 Remodeling Impact Report, released by NAR April 9, 2025, a basement converted to living area was estimated to recover 71% of its cost at resale, an attic conversion 67%, a bathroom addition 56% and a new primary suite 54%. Those percentages set contractors’ cost estimates against agents’ value estimates, not sale results, and price new work, not the cost of opening finished walls for an inspector.
When legalizing costs more than the space adds, selling as-is can net more. Run both on a seller’s net sheet or our seller net sheet calculator, and see selling a home as-is.
Insurance moves with the same space. The National Association of Insurance Commissioners’ homeowners insurance guide says the addition of a room, new insulation or remodeling add value to a home and therefore may increase replacement cost. If you legalize the space before listing, confirm your coverage still matches the home; see home insurance and renovations.
What does a retroactive permit cost in Michigan?
First find out who enforces the code at your address. LARA’s Bureau of Construction Codes, on its building permit information page, suggests applicants review the Statewide Jurisdiction List first, because enforcement may be conducted by the state, the county or the local unit of government. The same page says a permit is also required when the use or occupancy of a structure or a portion of it is changed, the rule to ask about when a basement or garage became living space.
Fees depend on that answer. The construction code act tells each local government that enforces the code to set reasonable fees tied to its cost of permits, plan review and inspections, so local schedules differ. Where the state is the enforcing agency, the Bureau of Construction Codes fee schedule, effective April 1, 2024, sets these residential charges:
| Item | Fee where the state enforces the code |
|---|---|
| Building permit, improvement cost up to $1,000 (one inspection) | $75.00 |
| Improvement cost of $1,000 to $10,000 | $75.00 plus $10 per $1,000 over $1,000 |
| Improvement cost of $10,001 to $100,000 | $165.00 plus $3 per $1,000 over $10,000 |
| Improvement cost of $100,000 to $500,000 | $435.00 plus $2 per $1,000 over $100,000 |
| Work with no square foot computation | $100.00 base fee plus $100.00 per inspection |
| Additional inspection | $100.00 |
| Certificate of occupancy | $50.00 |
| Re-open an expired permit | $75.00 |
| Electrical, plumbing or mechanical permit application | $75.00 each, non-refundable |
| Electrical circuits | $5.00 each |
| Electrical fixtures and outlets | $6.00 per 25 |
| Electrical rough or additional inspection | $75.00 |
| Electrical final inspection | $75.00 |
Source: LARA Bureau of Construction Codes fee schedule, effective April 1, 2024. The bureau computes the improvement cost from its own Square Foot Construction Cost Table.
Hypothetical example, not an offer. Say the bureau’s cost table puts a basement finish at $40,000 and the house sits in a state-enforced jurisdiction. The building permit is $165.00 plus $3 for each of the 30 thousands over $10,000, or $255.00. An electrical permit adds the $75.00 application fee, $30.00 for six circuits, $6.00 for up to 25 fixtures and outlets, a $75.00 rough inspection and a $75.00 final inspection, or $261.00. The certificate of occupancy adds $50.00, for $566.00 in state building and electrical fees before any corrective work. The contractor’s bill is separate.
How does unpermitted work change your net proceeds?
It changes the bottom of the settlement statement, not the top, and that’s the number worth modeling. Whether you spend $4,000 on a retroactive permit or accept a $15,000 price concession (a hypothetical example, not an offer), the question is identical: what lands in your account, and what does it buy next?
Build the model from actual documents rather than estimates:
- Start with a written payoff statement: It includes principal, interest through the payoff date and release fees, and it expires. If your payments were paused, remember that forbearance is not forgiveness. The full balance plus any deferred amount is due at closing. Our guide to selling a home with a mortgage in forbearance covers the sequence.
- Add every lien to the payoff column: Delinquent taxes, judgment liens and construction liens generally must be satisfied at closing so title can convey. They do not follow the buyer.
- Handle a reverse mortgage on its own clock: A HECM balance becomes due and payable on the borrower’s death, on sale, or on a permanent move-out, and heirs generally get 30 days to respond to the due-and-payable notice and 6 months to sell or pay off, with HUD-approved extensions. The loan is non-recourse, so no one owes more than the loan balance or the property’s value, and when the balance exceeds the value the home may be sold to an unrelated buyer for at least 95% of the current appraised value with FHA insurance covering the shortfall.4 Start with selling a home with a reverse mortgage.
- Keep your improvement records: Capital improvements generally increase your adjusted basis, which reduces taxable gain. The federal home sale exclusion is up to $250,000 of gain, or up to $500,000 on a joint return, when you meet the ownership and use tests of 24 months out of the 5 years before the sale.5
- Treat commission as negotiable: Since August 17, 2024, offers of buyer-agent compensation cannot be published through an MLS, buyer agents must have written agreements before touring, and listing agreements must conspicuously state that compensation is not set by law.
This is the part of the transaction Align Lending actually works. We are a mortgage broker, not a listing brokerage and not a law firm, so we model the net against your next purchase and shop the file when a buyer’s lender has questions about the unpermitted space. For everything else in this category, our Selling Situations guide maps the neighboring problems.
How can a contractor’s lien follow you to closing?
Hired corrections carry lien rights. Under Michigan’s Construction Lien Act, a construction lien attaches to the entire interest of the owner who contracted for the improvement, and a recorded claim of lien and the discharge that clears it both go through the county register of deeds. For example, Oakland County’s Register of Deeds fee list, effective October 1, 2016, charges $30.00 to record a deed, mortgage or other instrument, including the $4.00 state survey and remonumentation fee, plus $3 for each additional referenced liber and page. If a claim is already recorded, see selling a home with a lien.
What Michigan sellers should know
Michigan’s rules are statewide; the counter you stand at is not. The Stille-DeRossett-Hale Single State Construction Code Act sets the framework, but Oakland, Wayne, Macomb and township building departments differ in how they treat after-the-fact permits on basement finishes and garage conversions.
- The disclosure question is question-specific: The statutory form’s “Other Items” section asks whether you are aware of “structural modifications, alterations, or repairs made without necessary permits or licensed contractors.” There is no partial-credit answer; check yes and explain in the space provided.
- The agency is on a clock, and so are you: A Michigan enforcing agency must grant or deny a permit application within 10 business days, or 15 business days for an unusually complicated building. Failure to act within that window is treated as a denial for purposes of appealing to the construction board of appeals.
- Occupancy is a separate approval: A building altered in whole or in part may not be used or occupied until a certificate of use and occupancy is issued, though occupancy that was never discontinued during the alteration may continue for 30 days after the work is completed. The agency must issue the certificate within 5 business days of a written application when the building qualifies.
- Knowing violations carry real penalties: Knowingly violating the code, building in violation of a permit condition, or knowingly making a false statement in a permit application is a misdemeanor punishable by a fine of up to $500 or up to 90 days in jail, or both, with each day of noncompliance with a stop construction order a separate offense.
- Fraud claims outlive the closing: Michigan’s general limitations period for personal actions is 6 years. Concealment does not quietly expire at the closing table, which is the strongest practical argument for disclosing.
None of this is a substitute for counsel. Have a Michigan real estate attorney review your disclosure language and your purchase agreement before you sign, particularly if the work is structural or the buyer has already raised it.
Will legalizing the work raise your Michigan property taxes?
It can. Under MCL 211.27a(2), a parcel’s taxable value each year is the lesser of its current state equalized valuation or the prior year’s taxable value minus any losses, multiplied by the lesser of 1.05 or the inflation rate, plus all additions. MCL 211.34d defines those additions, and for new construction it values the addition at its true cash value multiplied by 0.50, so new square footage is added on top of the capped figure rather than inside the cap.
Space never on the roll is “omitted real property” under the same section: previously existing tangible real property not included in the assessment. It counts only if the assessing jurisdiction has a property record card or other documentation showing it was left out. Omitted real property discovered after the roll is completed is added for the current year and the 2 immediately preceding years under section 154.
After the sale, the buyer’s taxable value resets anyway, as Michigan Treasury explains. See how home improvements affect property taxes and how property tax assessments work, or run the address through our Michigan property tax calculator.
What do lead paint rules mean before you open walls in an older home?
Correcting work in a house built before 1978 usually means cutting into painted surfaces. According to the EPA’s Renovation, Repair and Painting page for contractors, last updated March 31, 2026, anyone paid to perform work that disturbs paint in housing built before 1978 generally must be certified, sole proprietors included. Small jobs may be exempt: six square feet or less of paint per room inside, or 20 square feet or less on the exterior.
The EPA’s guidance for do-it-yourselfers, last updated August 20, 2026, says the rule generally does not apply to homeowners working in their own home, but it does if you rent all or part of the home or flip houses for profit. The CDC’s lead prevention page, dated June 12, 2024, says homes built before 1978 probably contain lead-based paint and that paint which peels and cracks makes lead dust. Ask any hired firm for its certification; flipping houses covers the investor side.
How Align helps when the move is hard
Divorce, a job transfer, an inherited home or a growing family rarely arrive on a convenient schedule. Samantha lives and works in Oakland County and meets people across a desk, not through a call center.
She handles your next loan from the first conversation to the closing table, including refinancing to remove a co-borrower when a home stays with one person.
FAQ: Selling a home with unpermitted work
Here are answers to common questions about selling a home with unpermitted work.
Do I have to disclose unpermitted work if a previous owner did it?
Yes, if you know about it. Disclosure obligations attach to your knowledge, not to who swung the hammer. If an inspection, an appraisal, a neighbor or an old listing told you the addition was never permitted, that is knowledge you must pass along. Writing “unpermitted, seller has no records” on the disclosure protects you far better than silence. Our guide to how to handle seller disclosures covers the wording.
Will a lender refuse a mortgage on a house with unpermitted work?
Sometimes. Lenders rely on the appraisal, and an appraiser who flags unpermitted living space may exclude it from the square footage or call for the work to be corrected. Conventional loans are the most flexible; government-backed loans applying minimum property standards are stricter. Structural, electrical and plumbing work draws the most scrutiny. Because guidelines differ by lender, working with a mortgage broker lets one file reach several underwriting boxes.
Should I get retroactive permits before selling?
Pull them when the work is minor, the local department allows after-the-fact permits, and you have time before listing. Skip it when the correction would require opening walls or bringing an entire system to current code, since costs can exceed the value the space adds. Get a licensed contractor’s written estimate before deciding, and consider a pre-listing home inspection so you know the full scope first.
What happens if unpermitted work is discovered after the sale closes?
If you disclosed it, the buyer accepted the risk and generally owns the problem. If you concealed it, you can face a claim for the cost of correction plus damages. The building department can also require the new owner to permit or remove the work, which fuels the claim against you. The same logic governs other known defects, see selling a home with foundation issues.
Can a homeowner do their own electrical work in Michigan?
Yes, in a single-family home you own and occupy or will occupy. MCL 339.5737(3)(g) lets a homeowner install, alter or repair electrical equipment in that home and its outbuildings without an electrical license. The exemption covers licensing, not permits: LARA’s building permit page says ordinary repairs done without a permit exclude work on electric wiring, so expect to pull a permit and pass an inspection.
Does a home inspector check whether work was permitted?
Not under the American Society of Home Inspectors’ standard. The ASHI Standard of Practice says the inspector is not required to determine compliance of systems and components with codes, regulations, laws or ordinances, or the methods, materials and costs of corrections. A report can flag amateur wiring or a missing egress window; the building department’s permit records answer whether the work was permitted.
How long does a Michigan contractor have to file a lien?
Ninety days. Under MCL 570.1111, a claim of lien must be recorded with the register of deeds in the county where the property sits within 90 days after the contractor’s last furnishing of labor or material for the improvement. MCL 570.1117 then requires enforcement proceedings within 1 year after the claim is recorded. Collect lien waivers as you pay and order a title search before listing.
Does the buyer get a copy of the appraisal that flags unpermitted work?
Yes, on a first-lien mortgage. The CFPB says borrowers have the right to a free copy of the home appraisal, sent promptly after the report is completed and no later than three days before the loan closes. A permit comment can therefore surface in the final days of the contract, one more reason to disclose the work up front.
The bottom line on selling a home with unpermitted work
Selling a home with unpermitted work is legal; concealing it is the part that creates liability. In Michigan, the seller disclosure statement asks directly whether the property has structural modifications, alterations or repairs made without necessary permits or licensed contractors, and it must reach the buyer before you execute a binding purchase agreement, late delivery gives the buyer 72 hours to terminate. From there, decide between a retroactive permit and an as-is price using a contractor’s written estimate, not a guess. Conventional financing is the most flexible on unpermitted space; FHA and VA apply property standards that are stricter.
If you’re ready to plan what the proceeds actually buy, or you want to know how different lenders treat the house as it stands, talk to Align Lending. We’ll shop your scenario across our lender network and show you the numbers side by side. Call 248-506-5727 or start online. For the disclosure language and your liability, work with a Michigan real estate attorney.
Footnotes:
1. This article is general information about disclosure and building-code procedure, not legal advice. Disclosure duties, remedies for nondisclosure, permit requirements and enforcement practice vary by state, county and municipality, and the facts of your property control. Consult a Michigan real estate attorney before completing a seller disclosure statement or signing a purchase agreement. Return to text.
2. Align Lending is not acting on behalf of or at the direction of FHA or HUD. FHA program requirements are set by HUD and are subject to change; individual lenders in Align’s network may apply additional overlays. Return to text.
3. Align Lending works with VA-approved lenders and is not endorsed or sponsored by the Dept. of Veterans Affairs or any government agency. VA eligibility and property requirements are determined by the Department of Veterans Affairs. Return to text.
4. Align Lending is not acting on behalf of or at the direction of FHA or HUD. HECM rules, timelines and extension policy are set by HUD and are subject to change; confirm current requirements with the servicer and a HUD-approved housing counselor. Return to text.
5. This is general information, not tax advice. Adjusted basis, which costs qualify as capital improvements, deductible selling expenses and eligibility for the home sale exclusion depend on your individual circumstances and on records you can substantiate. Consult a qualified tax professional about your situation. Return to text.
Sources: Seller Disclosure Act coverage of transfers of not less than 1 or more than 4 residential dwelling units, MCL 565.952. Exemptions, including court-ordered transfers, foreclosures, transfers by a nonoccupant fiduciary and intrafamily transfers, MCL 565.953. Delivery of the written statement before the transferor executes a binding purchase agreement, and the 72-hour in-person and 120-hour registered-mail termination rights that expire on transfer by deed or installment sales contract, MCL 565.954. Transferor not liable for errors or omissions not within personal knowledge, and no violation for information discoverable only through inspection of inaccessible portions or by a person with trade expertise, MCL 565.955. Compliance by advising a purchaser that information is unknown, MCL 565.956. Disclosure form “Other Items” question on “structural modifications, alterations, or repairs made without necessary permits or licensed contractors,” MCL 565.957. Transfer not invalidated solely by noncompliance, MCL 565.964. Building permit application required before construction, Stille-DeRossett-Hale Single State Construction Code Act, MCL 125.1510. Permit application granted or denied within 10 business days, 15 business days for an unusually complicated building, and construction or alteration not commenced until a permit is issued, MCL 125.1511. Certificate of use and occupancy required for an altered building, the 30-day continued-occupancy allowance and issuance within 5 business days, MCL 125.1513. Misdemeanor penalties of up to $500 or 90 days, and separate offenses for each day of noncompliance with a stop construction order, MCL 125.1523. Michigan Construction Lien Act and attachment of a construction lien to the owner’s interest, MCL 570.1101 et seq. and MCL 570.1107. General 6-year limitations period for personal actions, MCL 600.5813. Appraiser comment required on an addition without the required permit and its impact on market value, Fannie Mae Selling Guide B4-1.3-05. Exclusion of accessory dwelling unit living area and finished basements from gross living area, reporting of more than one accessory dwelling unit as a deficiency, and release of 203(k) funds only when work meets local codes and required permits and inspections, HUD Handbook 4000.1. Property must comply with the standards of planning, construction and general acceptability prescribed by the Secretary for a loan to be eligible for guaranty, 38 CFR 36.4351. Lead hazard pamphlet, disclosure of known lead-based paint and hazards, records, and the 10-day inspection opportunity for pre-1978 target housing, 42 U.S.C. 4852d; 24 CFR Part 35; 40 CFR Part 745; U.S. Environmental Protection Agency. Home sale exclusion of up to $250,000, or up to $500,000 on a joint return, with the 24-month ownership and use tests, IRS Topic No. 701. HECM due and payable on death, sale or permanent move-out; heirs’ 30-day response to the due-and-payable notice and 6-month sale or payoff period with HUD-approved extensions; non-recourse limit; and satisfaction of an underwater HECM by a sale to an unrelated third party for at least 95% of appraised value, 24 CFR 206.125 and HUD Handbook 4000.1. Prohibition on publishing offers of compensation through an MLS, the written buyer agreement requirement, and the conspicuous disclosure that compensation is not set by law and is fully negotiable, effective August 17, 2024, National Association of REALTORS®.
This article is for informational purposes only and is not intended to provide legal, financial, or tax advice. Disclosure duties, building code adoption, permit fees, after-the-fact permitting practice, statutory dollar amounts and timelines change and vary by state, county and municipality; confirm requirements with your local enforcing agency, a Michigan real estate attorney and a qualified tax professional. Figures shown are illustrative, are not a rate quote or an offer of credit, and are subject to change. Align Lending is an independent Michigan mortgage broker, NMLS #2041154.
Sources
Every outside source this guide links to, in the order it appears. How we choose and check sources
- Michigan’s construction code actMichigan Legislature
- Has been issued for the alterationMichigan Legislature
- Michigan’s Seller Disclosure Act appliesMichigan Legislature
- Give the buyer the lead hazard pamphletlaw.cornell.edu
- Seller disclosure and liability basicsNolo
- Fannie Mae’s appraisal guidanceFannie Mae Selling Guide
- Under HUD’s handbookU.S. Department of Housing and Urban Development
- Federal regulation providesElectronic Code of Federal Regulations
- Fannie Mae Selling Guide B4-1.3-06Fannie Mae Selling Guide
- HUD’s 203(k) program pageU.S. Department of Housing and Urban Development
- Find a certified home inspectorAmerican Society of Home Inspectors
- Unpaid contractors have rights under Michigan’s Construction Lien ActMichigan Legislature
- Released by NAR April 9, 2025National Association of Realtors
- Homeowners insurance guideNational Association of Insurance Commissioners
- Building permit information pageState of Michigan
- Statewide Jurisdiction ListState of Michigan
- Reasonable feesMichigan Legislature
- LARA Bureau of Construction Codes fee schedule, effective April 1, 2024State of Michigan
- Heirs generally get 30 daysConsumer Financial Protection Bureau
- The federal home sale exclusionInternal Revenue Service
- Register of Deeds fee listoaklandcountymi.gov
- The Stille-DeRossett-Hale Single State Construction Code Act sets the frameworkMichigan Legislature
- Statutory form’s “Other Items” sectionMichigan Legislature
- Misdemeanor punishable by a fine of up to $500Michigan Legislature
- Michigan’s general limitations period for personal actions is 6 yearsMichigan Legislature
- MCL 211.27a(2)Michigan Legislature
- MCL 211.34dMichigan Legislature
- Michigan Treasury explainsState of Michigan
- Renovation, Repair and Painting page for contractorsU.S. Environmental Protection Agency
- Guidance for do-it-yourselfersU.S. Environmental Protection Agency
- Lead prevention pagecdc.gov
- MCL 339.5737(3)(g)Michigan Legislature
- ASHI Standard of PracticeAmerican Society of Home Inspectors
- MCL 570.1111Michigan Legislature
- MCL 570.1117Michigan Legislature
- CFPBConsumer Financial Protection Bureau