How to sell a home during renovations without giving up your equity

This article is general information about selling property, not legal or tax advice. Disclosure duties, permit rules and lien rights vary by state and by municipality. Consult a Michigan real estate attorney and a qualified tax professional about your situation.

Homeowner and contractor reviewing a partially finished kitchen while deciding how to sell a home during renovations

You can sell a home in the middle of a renovation, and plenty of Michigan sellers do it every year. What the unfinished work really controls is not your asking price but your buyer pool: Fannie Mae will not buy a loan on a home whose appraised condition rates C6 until it is repaired to at least a C5, while an FHA Limited 203(k) lets a buyer finance up to $75,000 of repairs into the mortgage.1

That gives you a workable rule. If the remaining work is cosmetic and cheap, finish it. If it is structural, permitted, or would take months, stop spending, price to the condition, disclose everything you know, and market to the buyers whose financing is built for an unfinished house.

Learn how to decide between finishing and selling as-is, who can actually get a loan on your home today, what open permits do to a closing, and what Michigan law requires you to disclose. If you are earlier in the process, start with our Selling a Home guide.

Key takeaways:

  • Finish the cheap, visible work and stop: A new steel entry door recovered 100% of its cost and a closet renovation 83% in NAR’s 2025 Remodeling Impact Report, while a half-built addition returns nothing until someone finishes it.
  • Financing sets your buyer pool: Fannie Mae rejects loans on C6-condition homes until they are repaired to C5, an FHA Limited 203(k) finances up to $75,000 of repairs, a Standard 203(k) covers rehabilitation of at least $5,000, and HomeStyle Renovation caps renovation costs at 75% of the lesser of the purchase price plus renovation costs or the “as completed” appraised value.
  • Close out permits before you list: A Michigan permit on a house becomes invalid if work is not commenced within 180 days of issuance or if more than 180 days pass between inspections, and the statutory Michigan seller disclosure form asks in writing whether structural work was done without necessary permits or licensed contractors.

Can you sell a house that is still under construction?

Yes, and no law stops you. Michigan’s Seller Disclosure Act governs what you must tell a buyer, not whether you may list a property mid-project, and it applies to transfers of not less than 1 and not more than 4 residential dwelling units. The practical constraints are financing, safety and disclosure, in that order.

What changes is who shows up. A move-in-ready shopper with a small down payment and a conventional preapproval usually cannot buy a house with no kitchen countertops or an open electrical panel, because the appraisal will flag it. Cash investors, renovation-loan buyers and people who genuinely want a project can. Your job is to stop marketing to the first group and start marketing to the second. Our guide to selling situations covers the other circumstances that narrow a buyer pool the same way.

Should you finish the renovation or sell as-is?

Finish anything that costs less than a few thousand dollars and can be done in weeks; stop everything else. The test is not whether the work adds value in the abstract. It is whether finishing moves the property across a financing line or a safety line that is currently costing you buyers.

PathRemaining costRemaining timeFinancing effectBuyer poolPrice effect
Finish the cosmetic workUsually under a few thousand dollarsDays to a few weeksKeeps conventional and FHA financing on the tableEvery buyer typeBest net; NAR puts a steel entry door at 100% cost recovery
Finish the structural workOften five figuresWeeks to monthsMoves the appraisal off a C6 condition ratingEvery buyer typeUsually recovers the cost, rarely more
Sell as-is, permits closedNo further spendNoneConventional possible if condition rates C5 or betterInvestors, renovation-loan buyers, some retail buyersPriced off cost to complete plus a risk margin
Sell as-is, permits openNo further spend, plus closeout feesSet by the building departmentCan stall the appraisal, the title work and the closingMostly cashLargest discount and the highest fall-through risk

Finish these, then stop

Cheap and visible beats expensive and structural every time when you are already committed to selling. NAR’s 2025 Remodeling Impact Report, produced with the National Association of the Remodeling Industry, found a new steel front door recovered 100% of its cost at resale, a closet renovation 83%, and a new fiberglass front door 80%. The same report found Realtors most often recommend painting the entire home (50%), painting a single interior room (41%) and new roofing (37%) before listing. You can browse the underlying NAR remodeling impact research on project payback yourself.

  • Paint, trim and hardware: Neutral paint, replaced outlet covers, matching door hardware and finished trim transitions cost hundreds, not thousands, and they read as “done” in photos.
  • Flooring transitions and thresholds: An unfinished floor edge signals an abandoned project. A transition strip signals a finished room.
  • The front door and entry: The highest-recovery project in NAR’s report is also the first thing a buyer touches.
  • Anything a home inspector will call a safety hazard: Exposed wiring, missing GFCI outlets, open junction boxes, missing handrails. These are cheap and they are the items that push an appraisal toward a C6 rating.

Where the money disappears

Half-built additions, custom kitchens and structural work rarely pay you back on a compressed timeline. A partly framed addition is worth less than nothing to most buyers, because they inherit your permit, your contractor’s warranty gap and the cost of correcting whatever the inspector finds. A custom kitchen finished to your taste in the last 60 days before listing is a bet that the next owner shares your taste. And a structural project stopped halfway is the single item most likely to fail an appraisal outright.

If you have already decided to stop spending, read our comparison of selling a home as-is before you write the listing, because “as-is” is a pricing and negotiating posture, not a shield against disclosure duties.

What do typical renovation projects cost to finish?

Compare your contractor’s remaining bid with what owners spent. According to the U.S. Census Bureau and HUD’s 2023 American Housing Survey home improvements infographic, 51.6 million of 86.9 million homeowners, or 59%, made improvements, spending $827 billion from 2021 to 2023, with a median of $6,500 per owner. Do-it-yourselfers handled 36% of projects, the survey reported.

ProjectMedian spentProjects, 2021 to 2023
Roofing$10,0008.3 million
Kitchen remodels$8,0005.0 million
HVAC$5,50012.8 million
Bathroom remodels$5,0007.5 million
Flooring, paneling, ceiling tiles$3,00010.9 million
Doors and windows$2,8007.9 million

Source: U.S. Census Bureau and U.S. Department of Housing and Urban Development, 2023 American Housing Survey, Home Improvements. Medians rounded to the nearest $100.

Who can actually finance your home in its current condition?

Three groups, and knowing which one you are selling to is worth more than any staging decision. This is the part of a mid-renovation sale a mortgage broker can answer for you before you list, because the answer comes out of loan guidelines rather than local market feel.

  • Conventional buyers, if the condition holds up: Fannie Mae rates appraised condition C1 through C6. A C6 means damage or deferred maintenance with deficiencies severe enough to affect the safety, soundness or structural integrity of the improvements, and if any portion of the dwelling rates C6, the whole dwelling does. Loans on C6 properties are not eligible for sale to Fannie Mae, and any deficiency affecting safety, soundness or structural integrity must be repaired to a minimum C5 before the loan is sold. A C5 home, by contrast, has obvious deferred maintenance and needs significant repairs but can still be financed.
  • Renovation-loan buyers: These programs exist for exactly your house. An FHA Limited 203(k) lets a buyer finance up to $75,000 of repairs, improvements or upgrades into the mortgage. A Standard 203(k) handles bigger and structural jobs, where the rehabilitation cost must be at least $5,000 and the finished value still has to fit the area’s FHA limit. Fannie Mae’s HomeStyle Renovation is the conventional equivalent: on a purchase, renovation costs cannot exceed 75% of the lesser of the purchase price plus renovation costs or the “as completed” appraised value.2
  • Cash buyers and investors: No appraisal condition rules, no lender, and the fastest close. They price accordingly. Treat an investor offer as your floor, not your benchmark. Buyers who specialize in buying distressed properties will find your listing quickly.

The practical move is to have your listing agent name the eligible loan types in the remarks. “203(k) and HomeStyle eligible” tells a buyer’s agent something concrete; “needs TLC” tells them nothing. Our breakdown of the benefits of FHA 203(k) loans is worth sending to any buyer who loves the house but cannot see past the mess.

How do renovation loans size the work a buyer can take on?

Per the Fannie Mae Selling Guide section B5-3.2-02 (12/10/2025), work a HomeStyle buyer does personally “may not represent more than 10% of the ‘as completed’ value,” and the lender must approve renovations in advance and inspect completion of items costing over $5,000.

HomeStyle purchase, one buyer’s fileAmount
Purchase price$260,000
Renovation bid to finish the house$70,000
“As completed” appraised value$345,000
Ceiling on the buyer’s own work, 10% of $345,000$34,500
Work the buyer planned to do personally$40,000
Amount over the do-it-yourself ceiling$5,500

Hypothetical example, not an offer. Percentages from Fannie Mae Selling Guide B5-3.2-02; dollar amounts are assumptions.

Fannie Mae’s 75% cap on renovation costs ($247,500 here) leaves room; the 10% limit does not, so $5,500 of the buyer’s planned work needs a contractor.

FHA buyers also face a dollar ceiling: HUD’s Mortgagee Letter 2025-23 sets the 2026 low-cost area limit for a one-unit home at $541,287. See our loan limits tool and what a renovation loan is.

What open permits do to your closing

They are the item that most often blindsides a mid-renovation seller, and they run on a clock you do not control. Michigan’s construction codes run a 180-day clock. Under the Michigan Residential Code, which governs one- and two-family homes, a permit becomes invalid unless the work it authorizes begins within 180 days of issuance, or if more than 180 days pass between inspections. The Michigan Building Code, which covers everything else, invalidates a permit when the authorized work is suspended or abandoned for 180 days. Under either code a building official can grant written extensions, but each is capped at 180 days and requires justifiable cause.

Two more code provisions matter when the work is unfinished. A final inspection happens only after all work required by the permit is complete. And a building or structure cannot be occupied, nor its occupancy changed, until the building official issues a certificate of occupancy.

  • Call the building department before you call an agent: Ask what permits are open on the address, which inspections remain, and whether an expired permit must be reinstated or re-pulled. This call is free and it changes your listing strategy.
  • Expect the permit to surface anyway: Open permits routinely appear during title work, municipal inspections and the buyer’s own due diligence. Finding it yourself is cheaper than a buyer finding it 10 days before closing.
  • Unpermitted work is its own problem: Work done without a permit does not become permitted because you sold the house. Our guide to selling a home with unpermitted work covers retroactive permitting and what to disclose, and our overview of home renovation permits explains which projects need one in the first place.
  • An association is a second approval layer: If your home sits in a community with covenants, an architectural committee may have its own approval and completion requirements.

Unpaid contractors are the other title-side risk. In Michigan, a contractor, subcontractor, laborer or supplier loses the right to a construction lien unless a claim of lien is recorded within 90 days after their last furnishing of labor or material. Collect sworn statements and lien waivers as you pay people, because a contractor is required to give the owner a sworn statement when payment is due or on demand. Our guide to selling a home with a lien explains what has to clear before title can convey.

What happens to the loan that paid for the renovation?

It is paid from your sale proceeds. According to the Consumer Financial Protection Bureau, home equity loans and lines of credit are common second mortgages, and “second” means that when the home is sold to pay off the debts, that loan is paid off second. See selling with a home equity loan and our home equity line of credit guide.

According to the CFPB, a prepayment penalty typically applies only if you pay off the whole balance, for example by selling, within a set number of years, usually three or five. Under 12 CFR 1026.36(c)(3), a payoff statement must be sent no more than seven business days after a written request, so order a payoff statement for each loan early.

How to price and market a home that is not finished

Price off the finished comparable, then subtract the real cost to complete and a risk margin, and expect the buyer’s number to be larger than your contractor’s estimate. Buyers are not discounting the repair bill alone. They are discounting schedule risk, the chance that opening a wall reveals something worse, and the narrower resale market they inherit.

  • Get the cost to complete in writing: Two or three contractor bids, itemized, dated. A documented number is a negotiating asset; an unsupported “it just needs $20,000” is a negotiating liability.
  • Show what is done, not just what is left: Permits pulled and passed, receipts, warranty documents, a photo record of what is behind the drywall. This is the paperwork a renovation-loan underwriter and appraiser will want anyway.
  • Stage the finished rooms and be honest about the rest: Photograph completed spaces properly and label unfinished ones plainly. A listing that hides the project loses the buyer at the showing.
  • Keep the site safe and presentable: Clear debris, cover openings, secure tools and materials. An unsafe site suppresses showings and invites liability.
  • Treat commission as negotiable: Since August 17, 2024, offers of buyer-agent compensation cannot be communicated through an MLS, and buyer agents must have written agreements in place before touring. Nothing about a renovation changes that.

An appraisal on an unfinished home is its own event. Understanding how the appraisal process works helps you anticipate what an appraiser will call out, and our guide to renovation ideas that boost home value is useful if you still have time to redirect the budget.

What does an as-is price look like on paper?

LineAmount
Comparable finished sale$340,000
Less cost to complete, average of three bids$38,000
Less buyer’s risk margin, assumed 15% of the bid$5,700
As-is price to test$296,300
Less first mortgage and equity line payoffs$215,000
Equity before selling costs$81,300

Hypothetical example, not an offer. Every amount is an assumption; payoff order follows the CFPB.

Finish the math with the seller net sheet calculator and weigh the result against the pros and cons of a cash buyer.

What you have to disclose while the work is unfinished

Everything you know, in writing, on the statutory form, before you sign a purchase agreement.3 Michigan requires the seller disclosure statement to be delivered to the buyer before the seller executes a binding purchase agreement. If it arrives late, the buyer can terminate the agreement within 72 hours of in-person delivery or 120 hours of delivery by registered mail. Every disclosure under the act must be made in good faith, which the statute defines as honesty in fact in the conduct of the transaction.

The form itself asks about your situation by name. Under “Other items,” question 4 asks whether you are aware of “Structural modifications, alterations, or repairs made without necessary permits or licensed contractors.” There is no version of a mid-renovation sale where that question is comfortably ignored.

The form also contains a rolling obligation most sellers miss: if any changes occur in the structural, mechanical or appliance systems of the property between the date of the form and the date of closing, the seller will immediately disclose the changes to the buyer. On an active jobsite, that is not a theoretical clause. If your contractor opens a wall in week three of the contract and finds knob-and-tube wiring, that is a disclosure event.

Two more rules apply regardless of condition. Selling “as-is” does not waive the duty to disclose known defects. And if the home was built before 1978, federal law separately requires you to give the buyer the lead hazard pamphlet, disclose known lead-based paint and hazards, and allow a 10-day inspection opportunity, which matters enormously when your renovation involves sanding or demolition. Our explainer on what a seller’s disclosure is walks the form line by line, and Nolo’s overview of disclosure duties when selling a house is a reasonable orientation. Neither replaces a Michigan real estate attorney reading your specific facts.

Does lead-safe work matter if the house was built before 1978?

Yes. According to the CDC, homes built before 1978 “are likely to have some lead-based paint,” and sanding, cutting and replacing windows “can create hazardous lead dust.” Per the EPA’s Renovation, Repair and Painting program (updated June 17, 2026), anyone paid to disturb painted surfaces in a pre-1978 home must be certified, “even sole proprietorships,” though the rule generally does not cover owners working on their own home. Under 42 U.S.C. 4852d(b), a knowing violation of the sale disclosure makes the seller liable for 3 times the buyer’s damages. See handling seller disclosures and a pre-listing inspection.

What Michigan sellers should know

Michigan’s permit clock and disclosure form are more specific than the national advice you will find elsewhere, and both cut against waiting.

  • Permits go invalid at 180 days: On a house, the Michigan Residential Code invalidates a permit if work is not commenced within 180 days of issuance or if more than 180 days pass between inspections; the Michigan Building Code uses a 180-day suspension or abandonment test. Extensions must be requested in writing and are capped at 180 days each. A stalled remodel quietly runs out of permit long before it runs out of drywall.
  • Final inspection and occupancy are separate gates: The code puts the final inspection after all permitted work is complete, and prohibits occupancy or a change of occupancy until the building official issues a certificate of occupancy. Many Michigan municipalities layer their own pre-sale or point-of-sale inspection on top of that. Requirements differ from one city to the next, so call your local building department rather than assuming a neighboring city’s rule.
  • Your contractor’s lien window is 90 days: A claim of lien must be recorded within 90 days after the lien claimant’s last furnishing of labor or material. Michigan also gives a contractor no construction lien on a residential structure at all unless the improvement was provided under a written contract that states the applicable license requirements and the contractor’s license number. Get the contract in writing and keep the sworn statements.
  • The disclosure form asks about permits directly: Michigan’s statutory form covers transfers of 1 to 4 residential dwelling units and asks under “Other items” whether structural modifications, alterations or repairs were made without necessary permits or licensed contractors. Court-ordered transfers, including those ordered by a probate court in administration of an estate, are exempt from the disclosure requirement, but ordinary sellers are not.

County and municipal practice varies more than the statute does. That is one more reason to have a Michigan real estate attorney read your file before you sign anything, especially if the work was done without permits or a contractor left the job unpaid.

What Michigan records will a buyer’s title search turn up?

An unpaid contractor’s claim is public. Under MCL 570.1111, a claim of lien is recorded with the register of deeds for each county where the property sits, and under MCL 570.1117 enforcement must be brought no later than 1 year after recording. The recorded claim does not leave the record on its own, so when you settle with a contractor, get a discharge recorded as well. Oakland County, for example, lists a $30.00 recording fee, including a $4.00 state survey and remonumentation fee (effective October 1, 2016), for recording documents such as a discharge.

Michigan’s form under MCL 565.957 also asks about “Any encroachments, easements, zoning violations, or nonconforming uses?” An addition framed past a setback answers that one, so get a survey before listing.

How Align helps when the move is hard

Divorce, a job transfer, an inherited home or a growing family rarely arrive on a convenient schedule. Samantha lives and works in Oakland County and meets people across a desk, not through a call center.

She handles your next loan from the first conversation to the closing table, including refinancing to remove a co-borrower when a home stays with one person.

FAQ: Selling a home during renovations

Here are answers to common questions about selling a home during renovations.

Can I list my home while construction is still going on?

Yes. Nothing prohibits listing a home mid-project, and many sell that way. Expect fewer showings, a buyer pool weighted toward investors and renovation-loan buyers, and offers that price in the work remaining. Keep the site safe and presentable, describe in writing exactly what is and is not finished, and deliver the seller disclosure statement before you sign anything. Our guide to selling situations covers the other circumstances that change how a home is marketed.

How much less will my home sell for if I do not finish?

It depends on whether the unfinished work is cosmetic or touches safety, soundness or structural integrity. Buyers start from the finished comparable, subtract the cost to complete, and subtract again for schedule risk and the narrower resale market they inherit, so the discount usually exceeds the contractor’s estimate. Work severe enough to earn a C6 condition rating costs the most, because it removes conventional financing entirely. Model the number before you list with our guide to the finances of selling.

Will a lender finance a home that is mid-renovation?

Sometimes. Fannie Mae will not buy a loan on a property rated C6 for condition until the deficiencies are repaired to at least a C5, so a missing kitchen, an unfinished bathroom or exposed wiring can end standard financing. Renovation loans are built for this: an FHA Limited 203(k) finances up to $75,000 of repairs, a Standard 203(k) handles rehabilitation of at least $5,000, and HomeStyle Renovation caps renovation costs at 75% of the lesser of the purchase price plus renovation costs or the “as completed” appraised value. See our overview of the benefits of FHA 203(k) loans.

What do I do about permits that were never closed out?

Call your municipal building department first and ask which inspections remain. In Michigan a permit runs on a 180-day clock (on a house it goes invalid if work never starts within 180 days of issuance or if more than 180 days pass between inspections), so an old permit may need to be reinstated or re-pulled before anyone can inspect it. Schedule what you can before listing. If the work cannot pass, disclose the open permit and price for it rather than hoping it goes unnoticed. Our guide to home renovation permits explains which projects require one.

Do I need a permit to finish the renovation before I sell?

Often, yes. Michigan’s construction code act, MCL 125.1510, requires the owner or the owner’s builder to apply for a building permit before construction, but ordinary repairs need none. LARA’s Bureau of Construction Codes says ordinary repairs do not include cutting away a wall or partition or cutting a structural beam or bearing support, and a permit is also required when the use or occupancy changes.

Does an appraiser value the home as it is or as it will be?

For a renovation loan, as it will be. Freddie Mac’s CHOICERenovation FAQ (dated March 27, 2025) says homes rated C5 or C6 are eligible if every issue behind that rating is cured as part of the completed renovations. The appraisal is completed “subject to completion, repairs or alterations,” and the condition rating reflects the hypothetical condition once the work is done.

How long do I have to keep lead paint disclosure records?

Three years. According to the EPA’s real estate disclosure page, last updated May 27, 2026, sellers and landlords must keep a signed copy of the disclosures for three years after the sale closes. The Lead Warning Statement can be attached to the contract or written into it, and the buyer’s inspection period can be changed by written agreement or waived by the buyer.

Do I pay capital gains tax if I sell in the middle of a renovation?

The renovation itself can lower the tax. IRS Publication 523 adds additions and improvements to your basis, which shrinks the gain, and counts repairs like painting only when they are part of a larger remodel. Gain left over is often covered: owning it and living in it as a main home for 2 of the last 5 years usually allows excluding up to $250,000, or $500,000 on a joint return. See capital gains tax exemptions.

The bottom line on selling a home during renovations

Selling a home during renovations is a financing problem wearing a construction costume. Finish the cheap, visible work, because NAR’s 2025 report puts a steel entry door at 100% cost recovery and a closet renovation at 83%. Stop before the structural projects. Close out permits, remembering that a Michigan permit runs out on a 180-day clock. Then price to the condition and market to the buyers who can finance it: cash investors, a Limited 203(k) buyer with up to $75,000 of repairs financed, or a HomeStyle buyer whose renovation budget stays within 75% of the lesser of purchase price plus renovation costs or the as-completed value. Disclose everything you know, in writing, before you sign.

If you’re ready to plan what this sale actually nets you and what it buys next, talk to Align Lending. We’re a Michigan mortgage broker, not a listing brokerage, so we shop your scenario across our lender network, model your net proceeds and payoff, and plan the financing if you need to close on the next home before this one sells. Call 248-506-5727 or start online. For disclosure, permit and contractor questions, work with a Michigan real estate attorney.

Footnotes:

1. Align Lending is not acting on behalf of or at the direction of FHA or HUD. Program figures are current HUD and Fannie Mae guidelines as published and are subject to change; confirm current limits and eligibility before relying on them. Return to text.

2. Renovation loan terms are set by the agencies and by individual lenders, not by Align Lending. Lenders in Align’s network apply their own overlays to 203(k) and HomeStyle files, so eligibility, contractor requirements and draw procedures vary by lender. Figures shown are program guidelines, not a rate quote or an offer of credit. Return to text.

3. This article is general information, not legal advice. Seller disclosure duties, permit and inspection requirements, and construction lien rights vary by state and by municipality, and an “as-is” sale does not waive the duty to disclose known defects. Consult a Michigan real estate attorney before listing, signing, or conveying property with unfinished or unpermitted work. Return to text.

Sources: Uniform Appraisal Dataset condition ratings C1 through C6, the C6 definition of deficiencies severe enough to affect safety, soundness or structural integrity, the rule that any portion rated C6 makes the whole dwelling C6, and the requirement that such deficiencies be repaired to a minimum C5 because loans on C6 properties are not eligible for sale, Fannie Mae Selling Guide B4-1.3-06. HomeStyle Renovation renovation costs on a purchase not to exceed 75% of the lesser of the sum of the purchase price plus renovation costs or the “as completed” appraised value, Fannie Mae Selling Guide B5-3.2-02. Limited 203(k) financing of up to $75,000 for repairs, improvements or upgrades and the Standard 203(k) minimum rehabilitation cost of $5,000, U.S. Department of Housing and Urban Development, 203(k) Rehabilitation Mortgage Insurance Program; the $75,000 Limited 203(k) limit was established by Mortgagee Letter 2024-13. Cost recovery of 100% for a new steel front door, 83% for a closet renovation and 80% for a new fiberglass front door, and Realtor recommendations to paint the entire home (50%), paint a single interior room (41%) and install new roofing (37%) before listing, National Association of REALTORS® and National Association of the Remodeling Industry, 2025 Remodeling Impact Report. Permit invalidity where work is not commenced within 180 days of issuance or more than 180 days pass between inspections, and written extensions of not more than 180 days each, Michigan Residential Code Section R105.5 (one- and two-family dwellings); permit invalidity after 180 days without commencement or after 180 days of suspension or abandonment, Michigan Building Code Section 105.5. Final inspection after completion of all work required by the permit, Michigan Building Code Section 110.3 and Michigan Residential Code Section R109; prohibition on use or occupancy, or a change of occupancy, before the building official issues a certificate of occupancy, Michigan Building Code Section 111.1 and Michigan Residential Code Section R110.1. Certificate of use and occupancy required for an altered building, MCL 125.1513. Seller disclosure requirements applicable to transfers of not less than 1 and not more than 4 residential dwelling units, MCL 565.952; exemption for transfers pursuant to court order, including transfers ordered by a probate court in administration of an estate, MCL 565.953(a); delivery before the transferor executes a binding purchase agreement and the transferee’s right to terminate within 72 hours of in-person delivery or 120 hours of delivery by registered mail, MCL 565.954(1)(a) and (3); disclosure statement form, including the “Other items” question on structural modifications, alterations, or repairs made without necessary permits or licensed contractors and the seller’s obligation to immediately disclose changes in the structural, mechanical or appliance systems between the date of the form and closing, MCL 565.957; each disclosure to be made in good faith, meaning honesty in fact in the conduct of the transaction, MCL 565.960. Construction lien claim of lien recorded within 90 days after the lien claimant’s last furnishing of labor or material, MCL 570.1111(1); no construction lien on a residential structure absent a written contract stating license requirements and the contractor’s license number, MCL 570.1114; contractor’s sworn statement to the owner when payment is due or on demand, MCL 570.1110. Michigan Construction Lien Act, MCL 570.1101 et seq. Lead hazard pamphlet, disclosure of known lead-based paint and hazards, and the 10-day inspection opportunity for pre-1978 target housing, 42 U.S.C. 4852d. Prohibition on communicating offers of compensation through an MLS and the written buyer agreement requirement effective August 17, 2024, National Association of REALTORS®.

This article is for informational purposes only and is not intended to provide legal, financial, or tax advice. Disclosure duties, permit and inspection rules, construction lien rights, and agency loan program limits change and vary by state, county and municipality; confirm your figures with your local building department, a Michigan real estate attorney and a qualified tax professional. Figures shown are illustrative, are not a rate quote or an offer of credit, and are subject to change. Align Lending is an independent Michigan mortgage broker, NMLS #2041154.

Sources

Every outside source this guide links to, in the order it appears. How we choose and check sources

  1. NAR remodeling impact research on project paybackNational Association of Realtors
  2. 2023 American Housing Survey home improvements infographicU.S. Census Bureau
  3. Selling Guide section B5-3.2-02Fannie Mae Selling Guide
  4. Mortgagee Letter 2025-23U.S. Department of Housing and Urban Development
  5. Consumer Financial Protection Bureau
  6. CFPBConsumer Financial Protection Bureau
  7. 12 CFR 1026.36(c)(3)Electronic Code of Federal Regulations
  8. Lead hazard pamphletU.S. Environmental Protection Agency
  9. Disclosure duties when selling a houseNolo
  10. CDCcdc.gov
  11. Renovation, Repair and Painting programU.S. Environmental Protection Agency
  12. 42 U.S.C. 4852d(b)law.cornell.edu
  13. MCL 570.1111Michigan Legislature
  14. MCL 570.1117Michigan Legislature
  15. $30.00 recording feeoaklandcountymi.gov
  16. MCL 565.957Michigan Legislature
  17. MCL 125.1510Michigan Legislature
  18. LARA’s Bureau of Construction CodesState of Michigan
  19. CHOICERenovation FAQFreddie Mac
  20. IRS Publication 523Internal Revenue Service
  21. Fannie Mae Selling Guide B4-1.3-06Fannie Mae Selling Guide
  22. U.S. Department of Housing and Urban Development, 203(k) Rehabilitation Mortgage Insurance ProgramU.S. Department of Housing and Urban Development