This article is general educational information about real estate markets, not investment, legal or tax advice. Align Lending is an independent Michigan mortgage broker, not a registered investment adviser, broker-dealer or financial planner. Talk to a licensed financial advisor about suitability, a CPA about tax treatment, and a Michigan real estate attorney about zoning, title and contract questions.

New trail and bridge beside renovated homes, showing how infrastructure projects affect housing markets

Infrastructure projects do move nearby housing values, but far less reliably than the pitch suggests. Across 73 estimates pooled in a 2004 Tinbergen Institute meta-analysis by Debrezion, Pels and Rietveld covering rail stations in the United States and Europe, the average effect was a 2.61% change in property value or rent for every 250 meters closer a property sat to a station, while individual estimates ran from a 12.84% decline to a 38.70% increase.

That spread is the story. A range that wide is not a premium you can underwrite; it is a distribution you place yourself inside of, using the project, distance and funding status in front of you. The timing cuts against intuition too: research on anticipation effects goes back to 1980, meaning value tends to move while a project is still a line on a map.

Learn how the impact of infrastructure projects on housing markets works, including the measured range of transit-oriented development premiums, the penalty for sitting too close, and the timing risk of an announcement that slips.

Key takeaways:

  • The average effect is modest and the spread is enormous: In the 2004 Tinbergen Institute meta-analysis of 73 rail-station estimates, the mean impact was 2.61% per 250 meters closer to a station, with individual results ranging from a 12.84% decline to a 38.70% increase.
  • Too close carries its own penalty: In the study David Bowes and Keith Ihlanfeldt published in the Journal of Urban Economics in 2001, homes within a quarter mile of a rail transit station showed an 18.7% lower value than homes farther out, while homes 1 to 3 miles away showed a 3.5% premium.
  • Authorized is not the same as funded: The Infrastructure Investment and Jobs Act became Public Law 117-58 on November 15, 2021, and the November 6, 2021 White House fact sheet described $89.9 billion in guaranteed public transit funding over five years, but a national authorization total tells you nothing about whether the project near a specific parcel has money programmed against it.

How much do infrastructure projects actually raise nearby home values?

Less than the marketing claims, and with a range wide enough to swallow the thesis. The 2004 Tinbergen Institute meta-analysis by Ghebreegziabiher Debrezion, Eric Pels and Piet Rietveld at Vrije Universiteit Amsterdam gathered 102 estimation results from studies of rail station proximity in the United States and Europe, used 73, and found a mean effect of 2.61% per 250 meters of distance closed, ranging from a 12.84% decline to a 38.70% increase.1

Narrow it to housing and the numbers calm down. Across the 52 residential observations the mean was 1.9% per 250 meters, ranging from a 3.8% decline to a 9.9% increase. Measured instead inside a quarter mile of a station, the 49 residential observations averaged a 6.2% gain but ran from a 19.3% loss to a 42.9% gain.

Three findings matter more to an investor than the headline average:

  • Station type changes the answer: Commuter railway stations showed a significantly higher impact than light rail or heavy rail and metro stations. Lumping all “transit” into one premium hides that.
  • Highway access competes with rail access: The authors concluded that when highway accessibility is not explicitly modeled, rail station impacts tend to be overestimated. Many circulating premium figures come from exactly those models.
  • The premium is worth more where transit is needed more: Station proximity carried higher value in lower-income neighborhoods, where households rely more on public transit.

For the framework that turns findings like these into a buy decision, see how to evaluate a real estate market for investment and the Investor Market Analysis hub.

Infrastructure typeWhat the evidence supportsWhere the effect shows upWhat to verify
Rail transit stationMean 2.61% per 250 meters closer across 73 pooled estimates; commuter rail outperformed light and heavy railMostly within 2 miles; the sign can flip inside a quarter mileStation type, walk distance, and whether the study controlled for highways
Highway or interchangeHighway and rail accessibility act as substitutes; one present reduces the measured effect of the otherCorridor-wide, strongest for uses needing vehicle accessWhether the parcel gains access or only traffic and noise
Broadband expansionFunded federally at scale ($65 billion in the November 2021 White House fact sheet), but property-level premiums are not well established in the literatureRural and exurban markets previously without serviceWhether service reaches the address, not just the county
Parks, trails and greenwaysFigures quoted for marquee projects usually trace to promotional reports, not hedonic studiesThe immediate walkshedTreat any percentage as unverified until you can name the study, year and geography

Why does value move on announcement instead of at the opening?

Because markets price expected access, not concrete, and the research has said so for more than 40 years. In 1980, Damm, Lerman, Lerner-Lam and Young published “Response of urban real estate values in anticipation of the Washington Metro” in the Journal of Transport Economics and Policy; Ferguson, Goldberg and Mark followed in 1988 with “The Pre-Service Impacts of the Vancouver Light Rail Transit System on Single Family Property Values.” Both studies exist because the value change was observable before service began.

That research describes what has already been measured, not what any future project will do. The practical consequence is that the announcement-to-completion window carries the cancellation and schedule risk, and this article does not tell you when to buy: timing and suitability are questions for a licensed financial advisor, not for an article like this one. What follows is how to read where a project sits.

  • Proposed: A planning study, a resolution, a candidate’s promise. No money. Any premium here is speculation.
  • Programmed and funded: The project appears in a state transportation program or a metropolitan planning organization’s improvement program with a dollar amount and a year, the first stage at which public documents show money behind it.
  • Under construction: Cancellation risk falls, and the block lives with detours, closures and staging yards for the duration.
  • Open: The access exists and can be measured rather than assumed, at this stage you are evaluating the neighborhood as it is, not the project as promised.

Zoning is the multiplier: new access only produces new value if the parcel may legally hold more building, see the impact of zoning laws on home value. New supply nearby has its own effects on rents and prices, covered in the economic impacts of new housing developments.

Can a property be too close to the project?

Yes, and the penalty can exceed the premium. In the study David Bowes and Keith Ihlanfeldt published in the Journal of Urban Economics in 2001, the distance bands relative to properties farther out ran like this: homes within a quarter mile of a rail transit station showed an 18.7% lower value, a quarter to a half mile a 2.4% gain, a half mile to a mile a 0.9% gain, and 1 to 2 miles and 2 to 3 miles a 3.5% gain each.

The mechanism is not mysterious. A station is an accessibility asset and an environmental liability at once. The negative externalities (noise, traffic, parking spillover) land hardest on the closest parcels. The curve is a hump: worst at the platform, best a comfortable walk away.

  • Highways cut as well as connect: An interchange is access; a mainline past the back fence is noise. Confirm which one the parcel gets.
  • Construction is a condition, not an event: Detours, closures and staging yards suppress rents and showings as long as the work runs.
  • The line matters more than the dot: Sitting on a rail alignment or a right-of-way taking is a different risk than sitting near a station.

Any source offering one percentage for “transit access” without naming the study, year and geography is describing a number that does not exist.

What can go wrong when you buy ahead of an announced project?

The project can arrive and still not produce the development you counted on. In Public Transportation: Multiple Factors Influence Extent of Transit-Oriented Development (GAO-15-70), published November 18, 2014, the U.S. Government Accountability Office examined six federally funded transit projects and found results varied widely, substantial activity around some, minimal or delayed activity around others. Supporting factors included demand for nearby real estate, land available to develop, residents’ support, and a transit system connecting people efficiently to jobs; hindering factors included high associated costs, difficulty obtaining financing, and a difficult local-government review and approval process. Local government actions mattered directly, supportive zoning, planning, infrastructure investments and tax incentives.

  • Schedule slip: Your holding period was three years; the project takes seven, and carrying costs run the whole time.
  • Descoping or cancellation: Funding is reprogrammed, a segment cut, a station dropped, and the parcel you bought for the station now sits near a bus stop.
  • Zoning that never moves: Access arrives and density does not, because the approval process GAO flagged never changes the entitlement.

One second-order effect deserves naming. Large public investments reshape who can afford to stay in a neighborhood, the Urban Institute’s research on how public investment shaped the housing market documents how federal housing programs, redlining, racial covenants and single-family zoning cemented inequities that persist today. Rising costs around a project create real displacement pressure. Treat that as a risk and a responsibility, not a thesis: the federal Fair Housing Act and Michigan’s Elliott-Larsen Civil Rights Act govern how property is marketed, financed and rented, and no investment case should rest on who moves out. Our explainer on the economic impacts of gentrification goes deeper.

How do you separate a project’s effect from a market that is already rising?

Measure the parcel against its own metro area first. A home near a new interchange that gained value over a year has shown no project premium at all if homes across the region gained the same. According to the Federal Housing Finance Agency’s second quarter 2026 House Price Index release (August 25, 2026), U.S. house prices rose 2.1% between the second quarter of 2025 and the second quarter of 2026, prices rose in 46 states and the District of Columbia, and the East North Central division, which includes Michigan, posted a 4.5% increase.

The state and metro rows in the FHFA House Price Index report for 2026 Q2 show how much the baseline moves even inside one state:

Area (FHFA purchase-only index, seasonally adjusted)1-year change to 2026 Q25-year change to 2026 Q2
Michigan3.80%38.80%
Detroit-Dearborn-Livonia, MI (metro division)4.90%39.74%
Warren-Troy-Farmington Hills, MI (metro division)3.26%33.00%
Grand Rapids-Wyoming-Kentwood, MI3.18%40.91%

Source: Federal Housing Finance Agency, FHFA House Price Index report, 2026 Q2, state and metropolitan tables, released August 25, 2026.

Two metro divisions in the same region differed by 1.64 points over the same year (4.90% against 3.26%), a gap in one year about the size of the whole station premium the Tinbergen Institute meta-analysis found per 250 meters (1.9%). A seller who points to a corridor’s price gain without showing the metro baseline beside it has not shown you a project effect. The hedonic studies above exist precisely because they hold the wider market constant; your own comparison should too. For the broader drivers, see how real estate appreciation works, regional housing market differences and real estate market cycles.

Supply is the other half of the baseline. The Census Bureau’s New Residential Construction report for September 2026 (released October 20, 2026) put building permits at a seasonally adjusted annual rate of 1,400,000, 3.0% below the September 2025 rate, housing starts at 1,221,000 and completions at 1,192,000, which the Census Bureau reported as 14.0% below September 2025. New units competing for the same renters near a finished project change what the project does to rents, which is why housing market trends belong in the same file as the project schedule.

What does a schedule slip cost while you wait?

The carrying cost of waiting can outrun any premium the research supports. The arithmetic below uses invented figures to show how; your own numbers come from your rent roll, the tax bill and insurance quotes.

Hypothetical example, not an offer. An investor pays $15,000 above comparable sales for a $250,000 duplex near a station planned to open in 3 years. Rent leaves $400 a month of taxes, insurance, repairs and vacancy uncovered. On schedule, that shortfall totals 36 x $400 = $14,400 before the station opens. If the opening slips to 7 years, it totals 84 x $400 = $33,600, so the slip alone adds $19,200, and the project now has to return $48,600 ($33,600 plus the $15,000 premium) just to break even on the bet.

Set that against the evidence. The residential mean in the Debrezion, Pels and Rietveld meta-analysis (Tinbergen Institute, 2004) was 1.9% per 250 meters closer to a station; on a $250,000 property, for example, 1.9% is $4,750. Even four bands closer (about 7.6%, or $19,000 on $250,000) falls well short of $48,600 in this example, and the same study recorded residential results as low as a 3.8% decline.

  • Price the premium separately: Write down how much of the offer is the project and how much is the property as it stands today, rented at today’s rent.
  • Run the shortfall at two schedules: The sponsor’s date and a date several years later. If the deal only works on the sponsor’s date, it depends on the schedule.
  • Check the exit without the project: Ask what the property sells for if the project is descoped and the premium never appears.

The tools for those numbers are in cash flow in real estate, evaluating a property’s cash flow potential, cap rates in real estate and how to analyze a property’s rental potential; the risk side is in real estate market risk, and every Align calculator is on the calculators page.

How do you verify a project is actually funded?

Follow the money through four documents. The Infrastructure Investment and Jobs Act became Public Law 117-58 on November 15, 2021, authorizing funds for federal-aid highways, highway safety programs and transit programs; the White House fact sheet issued November 6, 2021 described $110 billion in additional road and bridge funding, $89.9 billion in guaranteed transit funding over five years, $66 billion in additional rail funding, $65 billion for broadband and $55 billion for clean drinking water.2 None of that tells you whether the project three blocks from your parcel is real.

  • The state DOT’s multi-year program: The published list of road and bridge work with years attached. If a highway project is not in it, it is not funded.
  • The MPO’s transportation improvement program: Federally required in urbanized areas, the TIP lists projects with funding sources by year, the best single document for confirming money behind a project.
  • The county or municipal capital improvement plan: Water, sewer, parks and civic buildings, usually with a funding line.
  • Planning commission and council agendas: The earliest signal, often a year ahead of funding, and where projects quietly get descoped.

Pair those with market data. The Census Bureau’s new residential sales data counts new single-family homes sold and for sale, and its New Residential Construction release covers permits, starts and completions. For local conditions, the National Association of REALTORS® research library publishes existing-home sales, the Pending Home Sales Index, the Housing Affordability Index and county median prices. Zillow, Redfin and Realtor.com publish market research too, but prefer the primary federal series. See our post on the impact of transportation infrastructure on housing.

What Michigan investors should know

Michigan offers a clean case study in what a finished megaproject looks like. The Gordie Howe International Bridge, connecting Detroit and Windsor, opened to traffic on July 27, 2026 according to the project’s own news releases, after years of construction during which none of its access benefit had yet arrived.

  • Check the MPO first in Southeast Michigan: The Southeast Michigan Council of Governments (SEMCOG) maintains the region’s transportation improvement program showing which projects carry funding by year. Elsewhere, use the MPO covering that county.
  • Then the state and county layers: The Michigan Department of Transportation publishes its own multi-year program of planned road and bridge work, and counties and cities publish capital improvement plans. Confirm the project appears in a plan and a funded year before pricing appreciation into an offer.
  • Zoning is the local gate: Access without entitlement produces no new density. Verify zoning with the municipality and take title questions to a Michigan real estate attorney.

Where Align Lending fits is narrow: financing. We are an independent Michigan mortgage broker, not a market-selection service and not an investment adviser. If you are buying a rental near a project you have verified, we shop conventional investor loans, DSCR and non-QM options across competing wholesale lenders. Start with our Real Estate Investing guide for how investor underwriting differs.

How do Michigan’s own plans and laws affect a project near a property?

Michigan puts dollar figures, dates and legal duties on each layer of the funding trail, and each layer is public.

The state program and its dollar totals

On November 6, 2025, according to the Michigan Department of Transportation’s release, the State Transportation Commission approved the final 2026 to 2030 Five-Year Transportation Program for transmission to the Legislature by March 1, as state statute requires. The release reported $16.1 billion in anticipated state and federally funded investments: $10.7 billion in Highway Program projects, and $5.4 billion in Multimodal Programs, including $4.5 billion for public transportation (bus, marine, rail and ports) and $900 million for aeronautics. The program includes a list of trunkline construction projects by county, which is where a buyer checks for a named road or bridge job.

The regional TIP and its map

SEMCOG describes its Transportation Improvement Program as a four-year schedule of projects selected as priorities for funding from local governments, transit agencies and MDOT. Per SEMCOG, the FY 2026 to 2029 TIP was approved by its Executive Committee on April 25, 2025, began on October 1, 2025, and can be searched on an interactive projects map as well as a project list dated August 2026.

Local capital plans and special assessments

  • Six-year capital lists: Under the Michigan Planning Enabling Act, MCL 125.3865 requires a planning commission, after it adopts a master plan, to prepare a capital improvements program each year showing the public structures and improvements that can be undertaken within the next 6-year period. A township must do so only if it owns or operates a water supply or sewage disposal system, alone or jointly.
  • Who pays for the improvement: Under Public Act 188 of 1954, MCL 41.721 lets a township board defray the whole or any part of an improvement’s cost by special assessments against the property especially benefited. A sewer, water main or road project near a parcel can arrive as a bill on that parcel, so ask the township treasurer about pending or proposed special assessment districts and read the title commitment; see why title insurance matters and real estate due diligence.
  • Plan the tax bill on the buyer’s number: Per Michigan Treasury’s guidance on transfers of ownership, the year after a Michigan home sells, its taxable value resets to half of the assessor’s market value, so the seller’s tax bill is not your tax bill. Details are in how property tax assessments work, and the Michigan property tax calculator looks up the published millage for an address.

What the finished bridge looked like on day one

Click On Detroit reported that the bridge “officially opened to traffic” on Monday after 25 years in the making, with the U.S. rate of $5.75 for a personal vehicle at opening (July 27, 2026). CTV News reported 7,500 vehicles in the first 12 hours (July 28, 2026). Traffic counts and tolls are the measurable access the earlier sections describe; how they translate into nearby housing values is a question the studies above answer only as a range. For the purchase side, see buying a home as an investment property and zoning regulations.

How Align supports your analysis

Your analysis tells you whether a property works. Samantha tells you what it will cost to finance, using real offers from multiple wholesale lenders rather than a rate you saw online.

She lives and works in Oakland County, so local questions, including what Michigan's tax uncapping does to a rental's tax bill after you buy, are part of the conversation.

FAQ: Infrastructure projects and housing markets

Here are answers to common questions about infrastructure projects and housing markets.

How much do infrastructure projects increase property values?

It depends on project type and distance, and the honest answer is a range. The 2004 Tinbergen Institute meta-analysis of 73 rail-station estimates found a mean of 2.61% per 250 meters closer to a station, with results running from a 12.84% decline to a 38.70% increase. Treat any percentage quoted without a study, year and geography as unverified. See how to evaluate a real estate market for investment.

Does a planned infrastructure project change what a nearby property is worth?

It depends on the project, the distance and whether it gets built, and no article can time it for you. The hedonic studies summarized above measured changes that had often already appeared before service began, and they also recorded declines. Before treating any of it as a factor, confirm the money is programmed in a state transportation program, an MPO’s improvement program or a county capital improvement plan, not merely proposed, and take timing and suitability questions to a licensed financial advisor. See investor market analysis.

Can living too close to a transit station hurt home value?

Yes. In Bowes and Ihlanfeldt’s 2001 Journal of Urban Economics study, homes within a quarter mile of a rail transit station showed an 18.7% lower value than homes farther out, while homes 1 to 3 miles away showed a 3.5% premium. Noise, traffic and parking spillover concentrate on the closest parcels. See the impact of zoning laws on home value.

How do I find upcoming infrastructure projects near a property?

Start with the state department of transportation’s multi-year program, then the regional metropolitan planning organization’s transportation improvement program, which lists funded projects by year. County and municipal capital improvement plans cover water, sewer and parks, and planning commission agendas are the earliest signal. See the economic impacts of new housing developments.

What does a transportation improvement program have to include?

Under the federal planning rule 23 CFR 450.326, a TIP must cover at least 4 years and be updated at least every 4 years. Each project lists the type of work and its limits, the estimated total project cost, the federal funds proposed for each program year and the agency responsible. Its financial plan may include only projects whose construction or operating funds can reasonably be expected to be available.

How long does development take to show up after a transit line opens?

It can take a decade. GAO’s 2014 review of six federally funded projects in Baltimore, Washington, Charlotte, Santa Clara County, San Francisco and Houston found that some cities saw many new developments while others saw very little, or saw development take up to 10 years. GAO also named an unsupportive local population and a station layout unattractive for development among the obstacles.

Can Michigan zoning limit what gets built near a new station or interchange?

Yes. The Michigan Zoning Enabling Act lets a local unit of government regulate land use by district, and MCL 125.3201(4) lets it designate or limit the location, height, bulk, number of stories, uses and size of buildings. New access adds building capacity only where the local ordinance allows it, so read the current district rules and any rezoning request already on the planning commission’s agenda.

What fair housing rules apply when advertising a rental in Michigan?

HUD’s Fair Housing Act overview lists race, color, national origin, religion, sex, familial status and disability. In Michigan real estate transactions, MCL 37.2502 of the Elliott-Larsen Civil Rights Act also covers age, sexual orientation, gender identity or expression and marital status, and bars any advertisement or notice that indicates a preference or limitation based on those traits.

The bottom line on infrastructure projects and housing markets

Infrastructure moves housing markets, but the measured effect is modest and the spread is wide: the 2004 Tinbergen Institute meta-analysis of 73 rail-station estimates found a mean of 2.61% per 250 meters closer to a station, ranging from a 12.84% decline to a 38.70% increase, and Bowes and Ihlanfeldt’s 2001 study showed an 18.7% discount inside a quarter mile against a 3.5% premium 1 to 3 miles out. Researchers have repeatedly measured value changes appearing in anticipation rather than at the opening, which is why confirming that a project is programmed and funded belongs ahead of any assumption about what it will do to a price. Verify the money; do not underwrite the press release.

If you’ve found a property ahead of a funded project, talk to Align Lending. We shop investment financing across our lender network and show you competing terms side by side. Call 248-506-5727 or start online. Take suitability questions to a licensed financial advisor, tax questions to a CPA, and title, zoning and contract questions to a Michigan real estate attorney.

Footnotes:

1. The figures in this section are estimates from academic hedonic-pricing studies of specific markets and specific time periods, compiled in a meta-analysis. They describe what researchers measured, not what any particular property will do, and they are not a forecast, a projection or a representation of future value. Align Lending is a mortgage broker and is not a registered investment adviser, broker-dealer or financial planner; nothing here is investment advice or a recommendation to buy, hold or sell any property. Consult a licensed financial advisor about suitability and a CPA about tax treatment before acting on any of it. Return to text.

2. The dollar amounts described are the figures stated in the White House fact sheet dated November 6, 2021 for the legislation enacted as Public Law 117-58 on November 15, 2021. Authorized amounts are not the same as amounts appropriated, obligated or awarded, and individual project funding, scope and schedules change over time and can be reprogrammed or canceled. Confirm the current status of any specific project with the responsible state department of transportation, metropolitan planning organization or local government before relying on it. Return to text.

Sources: Public Law 117-58, short title “Infrastructure Investment and Jobs Act,” approved November 15, 2021, to authorize funds for Federal-aid highways, highway safety programs, and transit programs, and for other purposes, U.S. Government Publishing Office, govinfo. Funding descriptions of $110 billion in additional funding for roads and bridges, $89.9 billion in guaranteed funding for public transit over the next five years, $66 billion in additional rail funding, $65 billion for high-speed internet access and $55 billion to expand access to clean drinking water, White House fact sheet on the Bipartisan Infrastructure Deal, November 6, 2021 (archived). Statement that “with more than $50 billion in funding, EPA is working with states, Tribes, and localities to strengthen and rebuild America’s water infrastructure”, U.S. Environmental Protection Agency, Infrastructure Investments. Meta-analysis of 102 estimation results, 73 usable observations, mean station-proximity effect of 2.61% per 250 meters with a range of −12.84% to +38.70%; residential subsample mean of 1.9% per 250 meters ranging from −3.8% to +9.9%; residential within-quarter-mile mean of 6.2% ranging from −19.3% to +42.9%; the finding that commuter railway stations have a significantly higher impact than light and heavy railway/Metro stations; the finding that station proximity is of higher value in low-income residential neighborhoods; and the conclusion that when highway accessibility is not explicitly addressed, railway impacts on property values tend to be overestimated, Ghebreegziabiher Debrezion, Eric Pels and Piet Rietveld, “The Impact of Railway Stations on Residential and Commercial Property Value: A Meta Analysis,” Tinbergen Institute Discussion Paper TI 2004-023/3, Department of Spatial Economics, Vrije Universiteit Amsterdam. Distance-band property value effects of −18.7% (0 to 1/4 mile), +2.4% (1/4 to 1/2 mile), +0.9% (1/2 to 1 mile), +3.5% (1 to 2 miles) and +3.5% (2 to 3 miles), David R. Bowes and Keith R. Ihlanfeldt, “Identifying the Impacts of Rail Transit Stations on Residential Property Values,” Journal of Urban Economics, vol. 50, no. 1 (2001), pp. 1 to 25, as tabulated in the Debrezion, Pels and Rietveld meta-analysis. Anticipation-effect literature: D. Damm, S. R. Lerman, E. Lerner-Lam and J. Young, “Response of urban real estate values in anticipation of the Washington Metro,” Journal of Transport Economics and Policy, vol. 14 (1980), pp. 315 to 336; and B. Ferguson, M. Goldberg and J. Mark, “The Pre-Service Impacts of the Vancouver Light Rail Transit System on Single Family Property Values” (1988). Variation in transit-oriented development outcomes across six federally funded transit projects, with supporting factors (demand for nearby real estate, land available to develop, residents’ support, and a transit system connecting people efficiently to jobs), hindering factors (high associated costs, difficulty obtaining financing, a difficult local-government review and approval process) and local-government actions (supportive zoning, planning, infrastructure investments and tax incentives), U.S. Government Accountability Office, “Public Transportation: Multiple Factors Influence Extent of Transit-Oriented Development,” GAO-15-70, published November 18, 2014. Opening of the Gordie Howe International Bridge to traffic on July 27, 2026, Gordie Howe International Bridge project news releases. Definitions of the Census Bureau’s New Residential Sales and New Residential Construction programs, U.S. Census Bureau. Research products including Existing-Home Sales, the Pending Home Sales Index, the Housing Affordability Index and county median home prices, National Association of REALTORS® Research and Statistics. Historical role of public investment in shaping the housing market, and the statement that redlining, racial covenants and single-family zoning cemented inequities in housing and wealth that persist today. Urban Institute, Housing Matters. Identification of the Southeast Michigan Council of Governments (SEMCOG) as the region’s council of governments, semcog.org. Further reading: Urban Institute research on public investment and the housing market, Census Bureau new residential sales data, and NAR research on local market conditions.

This article is for informational purposes only and is not intended to provide investment, legal, financial or tax advice. Align Lending is an independent Michigan mortgage broker, NMLS #2041154, and is not a registered investment adviser, broker-dealer, financial planner, real estate brokerage or law firm. Research findings described here are historical measurements from named studies, not predictions, and nothing in this article should be read as a forecast of home prices, rents or mortgage rates. For a current mortgage rate, check the Freddie Mac Primary Mortgage Market Survey and get a quote based on your own file. Consult a licensed financial advisor about investment suitability, a CPA about tax treatment, and a Michigan real estate attorney about zoning, title and contract questions. Confirm the status and funding of any infrastructure project with the responsible government agency.

Sources

Every outside source this guide links to, in the order it appears. How we choose and check sources

  1. The U.S. Government Accountability Office examined six federally funded transit projectsgao.gov
  2. Research on how public investment shaped the housing markethousingmatters.urban.org
  3. The federal Fair Housing ActU.S. Department of Housing and Urban Development
  4. Michigan’s Elliott-Larsen Civil Rights ActMichigan Legislature
  5. Second quarter 2026 House Price Index releaseFederal Housing Finance Agency
  6. FHFA House Price Index report for 2026 Q2Federal Housing Finance Agency
  7. Tinbergen Institute meta-analysispapers.tinbergen.nl
  8. New Residential Construction report for September 2026U.S. Census Bureau
  9. White House fact sheet issued November 6, 2021bidenwhitehouse.archives.gov
  10. Federally required in urbanized areaslaw.cornell.edu
  11. New residential sales dataU.S. Census Bureau
  12. National Association of REALTORS® research libraryNational Association of Realtors
  13. The project’s own news releasesgordiehoweinternationalbridge.com
  14. Maintains the region’s transportation improvement programsemcog.org
  15. Publishes its own multi-year program of planned road and bridge workState of Michigan
  16. Michigan Department of Transportation’s releaseweb.archive.org
  17. MCL 125.3865Michigan Legislature
  18. MCL 41.721Michigan Legislature
  19. Michigan Treasury’s guidance on transfers of ownershipState of Michigan
  20. Reportedclickondetroit.com
  21. Reportedctvnews.ca
  22. MCL 125.3201(4)Michigan Legislature
  23. U.S. Government Publishing Office, govinfogovinfo.gov
  24. U.S. Environmental Protection Agency, Infrastructure InvestmentsU.S. Environmental Protection Agency




Scroll to Top
Align Lending logo